Financing the revitalization of a residential and commercial building with a rooftop extension in a central location in Vienna  

Investment information

Days to invest:
3
Investing round ends:
18/11/2026
Type:
Bond
Subordinated:
no
Invested so far:
€950,000.00
Price per bond:
€250.00
Transaction costs:
0.50 %
Min offer:
1 Unit
Maximum issue size:
€1,465,000
in 5,860 Units
Interest:
quarterly
Repayment:
bullet
ISIN:
DE000A4E19M9
WKN:
A4E19M
Broker:
Oneplanetcrowd International B.V
License:
ECSPR
i
Latest update October 21, 2026

Neubaugasse 70: New housing right in the heart of Vienna

Vienna is growing, yet fewer and fewer new apartments are being built. In the video, Stefan Ertl and Christopher Müller explain what convinced them about Neubaugasse 70: the location, the concept, and the economic rationale. A historic Gründerzeit building is being modernized and extended, creating new housing right where it's needed, in the heart of Vienna.

Stefan Ertl & Christopher Müller, Investment Managers Real Estate at Invesdor

Why you should invest

1

Revitalization and new construction under one roof

A Viennese Gründerzeit building is being comprehensively modernized instead of demolished. It will be extended by a full floor and a two-story rooftop extension. A rooftop extension will also be added to the rear wing. This preserves the building fabric, allows the building's history to live on, and creates new living space. 

Learn more
2

High demand for inner-city living

Vienna's housing market is under pressure: demand for housing is high, while fewer new apartments are being built. In established residential areas, the further development of existing buildings offers a contemporary solution: better use of living space, modernization, and rooftop extensions.

Learn more
3

Living in the heart of Viennese life

Neubaugasse is located in Vienna's vibrant 7th district, known for its scene and culture. Cafés, shops, and cultural offerings shape the neighborhood. The central location, short distances, and excellent connectivity combine urban living with high residential and recreational quality.

Learn more
4

Historical character. Contemporary living quality

The Gründerzeit building will be structurally upgraded and its energy performance improved: the existing apartments will be modernized, insulation improved, and the installation of an air-source heat pump with deep drilling is planned. Seven new rooftop apartments will complement the historic building.

Learn more
5

Experience driving development forward

The project is backed by the developers of nxt real estate, who have experience in urban district and existing property developments. They combine financial structuring with operational implementation and are themselves investing their own funds in the project.

Learn more
6

Your investment enables the next step

The property has been acquired and a building permit is in place. Your investment will complement the existing financing and is intended to enable the start of construction. Repayment is planned from the proceeds of the apartment sales after servicing the bank financing.

Learn more

Your investment is made under the Regulation (EU) 2020/1503 and is not protected by the deposit guarantee schemes established under Directive 2014/49/EU (Deposit Guarantee Schemes Directive). Your investment is also not protected by the investor compensation schemes established under Directive 97/9/EC (Investor Compensation Schemes Directive).

Overview

Property & project presentation

A new chapter is beginning for Neubaugasse 70 in the 7th district of Vienna. The Gründerzeit building from 1863 is set to preserve its historical character while being further developed for modern living. Its location on one of Vienna's well-known shopping streets brings public transport, gastronomy, retail, and urban life right to the doorstep.

The focus of the project is the revitalization of the existing building and the addition of a rooftop extension. Upon completion, the project will comprise 28 apartments, two commercial units, and two studios, one on the ground floor and another on the first floor. Of these, 21 apartments will be created in the modernized existing building and seven new apartments in the rooftop extension.

The plan is to create well-designed, contemporary apartments for people who want to live centrally in Vienna. At the same time, the project also targets buyers who wish to invest in inner-city housing. The apartments are intended to be sold individually.

In addition to modernizing the apartments, the building itself will also be further developed. Plans include improving thermal insulation and switching heating and hot water to an air-source heat pump combined with deep drilling. This is intended to energetically upgrade the existing old building and adapt it technically to today's requirements.

The rooftop extension is particularly noteworthy: seven additional apartments will be created here without developing new land. This makes better use of existing space and adds additional living space in a central location.

Project status

✓
Purchase & ownership
Purchase agreement 25.03.2026
Land register 08.07.2026
✓
Building permit
Building permit 11.06.2024
legally binding
○
Development & financing phase
Acquisition completed
Development since 2026
○
Start of construction
planned from 12/2026
○
Completion
planned by 12/2028
€
Bond repayment
planned by 30.10.2029,
from the proceeds of apartment sales

The project has already achieved important milestones. The property has been acquired and fully transferred to the project company. The acquisition from insolvency has been legally approved and registered in the land register. This clarifies the ownership situation.

The legally binding building permit is already in place. Currently, further execution planning is being prepared. Additionally, adjustments to the already approved plans are planned to better utilize the space in the existing building and the rooftop. Approval for this is still pending and is expected during the course of the project implementation.

The financing of the project is fundamentally structured. There are loan agreements with the financing bank as well as shareholder loans from the project partners. The funds raised via Invesdor are intended to complement this structure and be passed on to the project company as an equity substitute in the form of a shareholder loan. This is intended to create the conditions for the transition from planning to construction.

The start of construction is planned for the end of 2026. The construction period is currently estimated at around two years, with completion planned for the end of 2028. The apartments are then expected to be sold individually, predominantly around the time of completion and thereafter.

From an investor perspective, it is important to note: Some of the early project risks have already been reduced. Acquisition and the existing building permit are completed or secured. However, typical risks of a real estate project remain. These include, in particular, construction costs, the project timeline, the development of the real estate market, as well as the speed and price level of the later sale of the apartments. 

In preparing the building for the construction phase, essential steps have already been implemented. Most of the apartments are already vacant or will soon be vacated. For the remaining apartments, termination agreements are currently being concluded and replacement housing is being sought. An experienced asset manager is accompanying this process. This has created important prerequisites for the planned start of construction.

Whether the project can be implemented as planned therefore depends primarily on the further construction progress and the subsequent marketing of the apartments.

Location & Site Analysis

Location of Neubaugasse 70: Vienna with over 2 million inhabitants; U3 Neubaugasse approx. 4 min walk; Westbahnhof approx. 10 min walk; A1 highway approx. 15 min by car; Mariahilfer Straße approx. 3 min walk; MuseumsQuartier approx. 12 min walk

Macro Location

Vienna combines the character of a historic city with the life of a European metropolis. More than two million people have their home here. The city is the political, economic, and cultural center of Austria and has been regarded for years as an especially livable metropolis. As a growing urban area, it records a consistently high demand for housing.

At the same time, the volume of new construction is declining. Some of the planned projects are delayed or not realized at all due to increased construction and financing costs. This is creating a supply gap, particularly in central locations, while the demand for owner-occupied apartments remains high.

Undeveloped land in the inner districts is scarce. Many residential buildings date from the Gründerzeit and require structural or energy-efficient modernization but offer potential for revitalization and additional living space within the existing stock, such as through rooftop expansions. This makes the further development of existing residential and commercial buildings increasingly important, especially in sought-after inner-city locations like the Neubau district.

Micro Location

The property is located at Neubaugasse 70 in the centrally located Neubau district in 1070 Vienna. Neubaugasse 70 is where the city already lives: The neighborhood has grown, and the infrastructure is in place. Closed perimeter block development from the Gründerzeit, a high proportion of residential use, and a lively mix of gastronomy, retail, and culture characterize the surroundings. In the trendy and cultural district of Neubau, urban life is part of the neighborhood: Between Gründerzeit buildings, you will find small shops, cafés, restaurants, and galleries.

Neubaugasse itself stands for a lively shopping and strolling culture. With Mariahilfer Straße, Spittelberg, and the MuseumsQuartier nearby, further attractions are within walking distance. For people who want to live centrally and enjoy Vienna's diversity, this is a location advantage.

The connection to public transport is very good: The U3 line connects the Neubaugasse station within a few minutes' walk directly to Stephansplatz in the city center and to Westbahnhof with long-distance and regional transport. Bus and tram lines complement the offerings in the area. This makes it easy to combine the amenities of the neighborhood with the opportunities of the entire city.

The district is popular among students, young professionals, creative workers, and urban-oriented households who value short distances to work, education, and leisure. Owner-occupiers find a central address with a diverse environment here. For investors, location and transport links are important criteria for potential future rentals. Together with the planned modernization, these qualities form a good foundation for marketing the apartments individually.

Project Developer

Developing existing buildings requires an eye for their potential and the experience to turn it into a feasible project. Behind Neubaugasse 70 are the re-nxt invest GmbH based in Vienna as the investment company and the Neubaugasse 70 Development GmbH as the project company, as well as the development platform nxt real estate. The Neubaugasse 70 Development GmbH holds the property as the asset company.

The team's focus is on inner-city developments in the residential and building stock in sought-after locations. This includes upgrading historic structures, creating additional living space through revitalization, and preparing buildings for a new phase of use.

Dr. Andreas Köttl and Walter Hammertinger combine strategic and financial management with operational project development.

Dr. Andreas Köttl, Managing Director of re-nxt invest GmbH

Dr. Andreas Köttl
Managing Director, re-nxt invest GmbH

Dr. Andreas Köttl is Managing Director of re-nxt invest GmbH and Neubaugasse 70 Development GmbH, as well as co-founder of nxt real estate in Vienna. He is responsible for strategic direction, structuring financing, and engaging banks and equity investors. His experience from large-scale urban quarter and existing property developments is applied in particular at Neubaugasse 70 in overall management, risk management, and investor communication.

Walter Hammertinger, Managing Director of re-nxt invest GmbH

Walter Hammertinger
Managing Director, re-nxt invest GmbH

Walter Hammertinger is also Managing Director of re-nxt invest GmbH and Neubaugasse 70 Development GmbH and co-founder of nxt real estate. His focus is on substantive project development and operational implementation. At Neubaugasse 70, he is particularly responsible for coordinating with architects and specialist planners, liaising with experts and general contractors, and preparing the marketing and individual sale of the apartments.

Track record

Managing directors Dr. Andreas Köttl and Walter Hammertinger and their team have already been involved in various projects in Vienna, from residential and office buildings to the revitalisation of a listed grandstand.

> 20 yearsexperience in real estate development
> 600,000 m²gross floor area developed
> EUR 2 billioncapital and transaction volume

Selected track record in Vienna

2MokkaNeubaugasse 70Viertel ZweiProject locationNeubaugasse 70Zoom: 17 projects in Viertel Zwei1Korso3GrünblickZoom: Viertel Zwei urban quarter near the Prater, 2nd district
2Mokka17Viertel ZweiNeubaugasse 70
Project location17projects in the Viertel Zwei urban quarter, including Korso and GrünblickNeubaugasse 70
Zoom: Viertel Zwei urban quarter near the Prater
1Korso3Grünblick

1Korso

Residential and commercial
Total investment costs EUR 90 million · 13,500 m² residential + 4,500 m² commercial

✓Completed 2021

2Mokka

Residential
Total investment costs EUR 6.1 million · approx. 1,085 m²

✓Completed 2024

3Grünblick

Residential and retail
Total investment costs EUR 200 million · approx. 25,000 m² residential + 2,000 m² commercial

✓Completed 2025

Information and images: nxt real estate (total investment costs and floor areas as stated by the project owner, as of 10/2026; some images are visualisations); map data: City of Vienna, data.wien.gv.at (CC BY 4.0), © OpenStreetMap contributors (ODbL); zoom base map: basemap.at (CC BY 4.0). Past projects are no guarantee of how the current project will develop.

Investment Logic & Repayment Mechanism

The bond with a volume of up to €1.465 million serves as an equity substitute for the Neubaugasse 70 project in Vienna. The funds raised are intended to be passed on by the issuer as a shareholder loan to the project company and enable the start of revitalization and rooftop expansion. The bond complements the already agreed bank loan and the equity contribution of the project shareholders.

What is being financed?
  • Equity substitute for the Neubaugasse 70 project
  • On-lending of 800,000 euros as a shareholder loan to the project company
  • Financing costs of the bond, particularly an interest reserve
Start of revitalization and rooftop expansion
From Apartment Sales to Repayment
  • From the sales proceeds, the bank financing will first be serviced
  • The subsequently available funds will be used for the repayment of the bond capital
  • The interest payments are largely covered by the co-financed interest reserve
  • The repayment of the capital is scheduled for the end of the term
The sales proceeds are the intended basis for the repayment of the financing
Security & Risks

Details on collateral, ranking, and the key risks of this investment can be found in the section Security & Risks and in the KIIS under the Documents section. An investment involves project and market risks and may lead to a partial or total loss of the capital invested.


What interest and repayment essentially depend on:
  • whether construction and project development costs remain within the planned framework,
  • whether construction progress and completion can be implemented as planned,
  • whether the apartments can be sold individually in a timely manner and at the expected prices, and
  • whether the issuer and the project company can meet their contractual payment obligations.

Figures

Overall calculation

The total investment planned for Neubaugasse 70 amounts to approximately €19.165 million. The largest share will be allocated to construction and furnishing, the modernization of the existing building, and the creation of new penthouse apartments. This budget forms the economic foundation for the building’s next chapter.

Item Amount Share
Property / Acquisition including ancillary costs €6,658,350 34.7%
Construction and furnishing costs €8,045,717 42.0%
Ancillary construction costs / Project development €2,660,386 13.9%
Financing costs €1,800,547 9.4%
Total investment costs €19,165,000 100%

Sources of funds

The financing consists of a bank loan, shareholders' equity, and the bond via Invesdor.

Bank loan
72.3%
Senior loan from Hypo Tirol Bank AG amounting to approximately €13.85 million.
Shareholders' equity
20.1%
Shareholders' equity amounting to approximately €3.85 million, part of which has already been paid in.
Bond via Invesdor
7.6%
Up to €1.465 million in investor capital. Of this, €800,000 will replace part of the equity, while the remaining amount will cover the bond’s financing costs.

Business Case & Sales Proceeds

The economic perspective lies in the individual sale of the modernized existing apartments and the new penthouse apartments. The planned investment costs of approximately €19.17 million, including the costs of this bond, are offset by estimated sales proceeds of around €21.2 million.

This results in a planned project surplus of approximately €2.0 million in the base scenario, equivalent to about 10.4% of the investment costs.

Total investment costs (planned)
€19.17 million
Including property, construction costs, development costs, and financing costs of the bond
Planned sales proceeds
~€21.2 million
Individual sale of the renovated existing apartments and new penthouse apartments
Planned project surplus
~€2.0 million
Equivalent to approximately 10.4% of the investment costs in the base scenario
The key figures summarize the planned economic framework of the project in a simplified manner. They are based on the current budget and may change as the project progresses.

Possible exit scenarios

Base Scenario: Individual Sale: In the base scenario, the apartments are sold individually to owner-occupiers and investors. The proceeds will first be used to repay the bank financing. The subsequently available funds are intended to cover the interest payments and the repayment of the bond.

Alternative Scenario: Delayed Sale / Interim Letting: If marketing takes longer or sales prices fall short of expectations, the repayment may also be delayed. Temporary letting of individual apartments can generate income but does not automatically replace the required sales proceeds.

The described scenarios represent possible outcomes from today’s perspective. Whether and under what conditions sales will actually take place depends on further market and cost developments, as well as demand for owner-occupied apartments at the time of sale, and cannot be guaranteed.

Payment Flow

Start
Start of Term
01.11.2026
%
First Interest Payment
30.12.2026
interest paid in arrears
%
Interest Payments
quarterly in arrears
until end of term
€
Final Repayment
30.10.2029
planned repayment of the capital
The repayment of the bond capital is scheduled for the end of the term. Interest payments and capital repayment depend on the successful implementation of the project and the available proceeds; neither is guaranteed. The binding details regarding the term, interest payment dates, and payment modalities can be found in the Key Investor Information Sheet (KIIS) and the bond terms and conditions.

Collateral & Risks

For this financing round, the following security is provided: The re-nxt invest GmbH assigns its current and future repayment claims from a shareholder loan amounting to €1,312,500, including interest and ancillary claims, to the Invesdor Collect GmbH as security trustee for the investors. The security thus consists of loan receivables against the project company and not in a direct security interest in the property or its rental income and sales proceeds.

The value of the security depends in particular on the economic capacity of the project company. If the project company cannot repay the loan in full or in part, the security may also lose value.

Detailed information on the securities can be found in the Key Investor Information Sheet (KIIS) in the document section of this financing round.

Simplified risk summary

Investments in bonds are associated with very high risks. You may lose part or all of your invested capital.

The following text contains a brief and highly simplified overview of selected risks of an investment in the project.

This overview is not complete and does not replace the detailed description of the risks in the Key Investor Information Sheet (KIIS).

Before you invest, you must read and carefully review the KIIS in full and check whether you understand and can bear all the risks described therein.

In the event of discrepancies between this summary and the KIIS, the KIIS shall be authoritative.

Key Risk Areas (Brief Overview)

Project and Implementation Risks:
The renovation and attic conversion may incur higher costs or take longer than planned. Issues during construction, shortages of materials or skilled labor, weather influences, delays in tenant move-out, as well as changes to the construction plans or required permits can lead to project delays. There is currently no fixed-price contract with the general contractor. The successful implementation of the project also depends on a limited number of key personnel and on the project company being able to fulfill its financial obligations to the project developer, particularly from the shareholder loan.

Market, Sector, and Default Risks:
The planned sales of residential and commercial units may be delayed, fail to materialize, or only be achieved at lower prices than intended. The construction and real estate sector can be adversely affected by shortages of materials and skilled labor, changes in the interest rate environment, the general economic development, as well as legal and regulatory changes. The project developer was only recently founded and therefore has only a limited financial history. In the event of insufficient cash flow or in the case of insolvency of the project developer or the project company, interest and repayments may be delayed, only partially made, or not made at all. The security consists of assigned claims from a shareholder loan against the project company. Investors thereby do not receive direct security rights to the property. The value of the security depends in particular on whether the project company can repay the loan. Since the bank financing is serviced as a priority, there is a risk that the security may not achieve sufficient proceeds in the event of economic difficulties or insolvency.

Return, Platform, and Liquidity Risks:
The return may be lower than expected, delayed, or fail to materialize entirely. Inflation, cost increases, and the individual tax situation can additionally reduce the achievable return. If the platform is temporarily or permanently unavailable or ceases its business operations, communication as well as interest and repayments may be delayed. However, the contractual claims against the project developer remain unaffected. The bonds have a fixed term and generally cannot be ordinarily terminated during this period. Currently, there is neither stock exchange trading nor a liquid secondary market. Investors may therefore be forced to hold the bonds until the end of the term or sell them only at a financial loss.

Investor Rights and Technology Risks:
Bondholders have no voting, participation, or co-determination rights and cannot influence either the business activities of the project developer or the use of the funds raised. A majority of bondholders can decide on changes to the bond terms that may be disadvantageous for individual investors. Technical errors, cyberattacks, or failures of the electronic securities register, the digital safe deposit box, or the custody solution can impair or prevent access to the electronic securities or their transfer and, in the worst case, lead to their irretrievable loss.

A complete and detailed description of all risk factors can be found exclusively in the KIIS in the document section of this financing round.


End of marketing content

Documents

Updates

UPDATE of 29.10.2026

1. How large is the economic buffer in the project?

The first buffer is the planned project surplus of approximately €2 million. It absorbs, for example, higher construction costs, delays, or lower sales prices. Only once this surplus has been used up would a further €2.025 million from the shareholders come into play. This money has already been paid in and ranks contractually subordinated to the bond. Sales proceeds therefore serve the bank first, then the bond, and only then the subordinated shareholder loans. Together with the planned surplus, this results in an economic buffer of approximately €4 million ahead of the bond. In total, the shareholders contribute equity of approximately €3.85 million, which corresponds to around 20% of the planned total investment costs. They therefore bear a significant share of the project risk themselves.

In our short video, we explain this in a clear way:

2. What happens if the maximum amount is not reached?

First and most important: as long as the financing of the project is not fully secured, we do not pay out any partial amounts. We check this before every payout.

If the maximum amount is not fully reached, we are currently speaking with the project developer about various ways to close the remaining financing gap. The options range from additional direct investors approached through the project developer's network, to additional funds from the shareholders and alternative financing sources, to initial binding prospective buyers for apartments in the project. These discussions are still ongoing. As soon as there are results, we will of course inform you promptly.

UPDATE of 21.10.2026: FAQ

In this update, we answer your questions about the repayment schedule, project financing, progress and planning, developments in the real estate market, investment returns, risks and guarantees, and the legal terms of the project.

Vienna is growing, most recently more strongly than any other Austrian federal state. At the same time, significantly less new housing is being built. High demand is therefore meeting a shrinking supply of new-build housing, particularly in the inner districts, where hardly any land is still available. This is exactly where the project comes in: it creates living space in an existing building, in the middle of the city.

The figures: at the beginning of 2026, around 2.04 million people lived in Vienna, and the city expects around 2.11 million by 2030. The number of completed residential units fell from more than 14,000 in 2023 to around 9,200 in 2025; around 8,200 to 8,300 are expected in each of 2026 and 2027.

Neubau is Vienna's culture and creative district: studios, cafés, small shops and the MuseumsQuartier shape the neighbourhood, and Gründerzeit buildings shape the streetscape. Living space here is in demand and scarce, as the district is densely built up and there is practically no vacant land for new construction. Additional apartments are therefore created mainly where existing buildings are upgraded and extended upwards. This is exactly what is happening at Neubaugasse 70: the building is being modernised and supplemented by an attic storey, and after completion the apartments will be offered in a location where modern living space is in demand.

The market has regained its footing after the correction caused by the turnaround in interest rates. After two years of slightly falling prices, prices for condominium apartments have been rising again since the end of 2025, demand for condominium apartments is back at the level seen before the interest rate increases, and market observers expect prices to continue rising moderately in 2026. At the same time, new construction remains at a low level. This is no guarantee of future prices, but the environment for selling modernised apartments in a central location is intact.

A Viennese Gründerzeit building dating from 1863 at Neubaugasse 70 will be comprehensively modernised and extended by an additional full storey and an attic conversion. According to the current planning, 28 residential units (21 in the existing building, 7 new in the attic storey), 2 commercial units and 2 studios will be created, which are to be sold individually. A portion of the bond capital will be passed on to the property company by way of a shareholder loan and will finance the further implementation of the project; the remaining portion covers the issuance and financing costs.

Yes. In Vienna, a large share of new living space is created not on vacant land but in existing buildings: in 2025, building permits were granted for 12,918 residential units in Vienna, of which 4,013, almost one in three, through extensions, storey additions or conversions of existing buildings. At the same time, the Vienna Building Code protects the historic building stock: since 2018, buildings erected before 1945 may only be demolished with a permit, and the rules were tightened further in 2023. Refurbishment and adding storeys instead of demolition is therefore the intended route to creating additional living space in the inner districts.

Instead of demolition and new construction, an existing Gründerzeit building is being preserved and further developed, and new living space is created without sealing additional land. The modernisation also improves the building's energy performance, saving energy in operation.

The property has been acquired and the building permit is legally binding. An important milestone has therefore already been reached. The start of construction is planned for the end of 2026, the construction period is estimated at around two years, and completion is scheduled for the end of 2028. The units will then be sold individually. All dates are planned figures of the project owner.

A significant milestone has already been reached: the building permit is legally binding, so permitting and planning risks have been resolved. The focus now is on securing the construction costs. For this purpose, the construction works are to be carried out by a general contractor selected in a so-called target price procedure: the costs are calculated jointly before the contract is concluded and agreed as a target price. The contract is scheduled to be awarded to the general contractor this year.

Yes. Modernised apartments in a central Viennese location are in demand, and supply is becoming scarcer. Demand for condominium apartments in Vienna is back at the level seen before the interest rate increases, and the number of registered apartment purchases has recently risen significantly. In the rental market, demand has exceeded supply for around two years, and apartments are re-let almost immediately. At the same time, the number of newly completed apartments continues to fall.

Behind re-nxt invest GmbH are the managing directors Dr. Andreas Köttl and Walter Hammertinger, both co-founders of the developer platform nxt real estate. Each of them has more than 20 years of experience in real estate development; they have developed projects with more than 600,000 m² of gross floor area and have been responsible for capital and transaction volumes of more than €2 billion. Together with their team, they have already been involved in various projects in Vienna and have known the Viennese market for years.

The project rests on three building blocks: bank financing, the shareholders' own funds and the bond via Invesdor. Alternative financing such as this bond is becoming more important because banks are now more cautious about financing project developments. It closes the gap between the bank loan and own funds and ensures that projects do not remain on the drawing board but are actually implemented. Here, the bond is intended to enable the start of construction.

The figures: of total investment costs of approx. €19.17 million, the bank finances approx. €13.85 million (72.3%), the shareholders contribute approx. €3.85 million in own funds (20.1%), and the bond accounts for up to €1.465 million (7.6%).

Banks finance construction projects only up to a certain share of the total costs. For regulatory reasons, since 2025 they have also had to back financing for project developments with more capital. Lower capital backing is generally only possible once a large share of the units has been sold before construction starts. For a project that sells the units individually only after completion, a financing gap therefore remains, which the shareholders' own funds and the bond close together.

From the sales proceeds, the bank is serviced first, then the bond. The bond does not bear the first loss: losses are first borne by the planned project profit and the subordinated own funds of the shareholders (details under “How is the project secured?”). The bond is subordinated to the bank.

There is no conventional, asset-based collateral over the property for the bond. This made it all the more important to us that the shareholders contribute a substantial amount of their own funds to the project. They have done so: the shareholders are contributing around 20.1% of the planned total investment costs, €3.85 million in total, in the form of shareholder loans. Of this amount, €2,025,000 has already been paid in and contractually subordinated on a qualified basis: it ranks behind the loan through which the investors' funds flow into the project. This amount serves as a loss buffer: it is only drawn upon once the planned project profit of around €2.0 million has been used up. Put simply: the project would have to fall around €2 million short of its plan before this buffer is drawn upon at all, and only once it, too, has been used up would the bond be affected.

In addition, the return flow of the investors' funds is secured. The issuer, re-nxt invest GmbH, passes the investors' funds on to the property company by way of a shareholder loan. It has assigned all of its claims under this loan agreement of €1,312,500, including interest and ancillary claims, to Invesdor Collect GmbH as security trustee for the investors. As a result, the return flows from the property company are legally allocated to the investors and enforceable by them.

Important: the buffer and the assignment are planned figures and security instruments, not a guarantee. The assigned claim is subordinated to the bank, and its value depends on the economic development of the property company.

The interest rate was set by the project owner and is based on the current market situation and the risk-return profile of this bond. Whether the investment is right for you is your own decision.

The term from 1 November 2026 to 30 October 2029 follows the course of the project: start of construction at the end of 2026, around two years of construction, completion at the end of 2028, followed by the sale of the units. If the project progresses faster, the project owner may repay earlier: in full at any time, in part after the expiry of 24 months.

Interest is paid quarterly, on 30 March, 30 June, 30 September and 30 December. The first payment is made pro rata on 30 December 2026, the last pro rata on 30 October 2029 together with the repayment.

Repayment is scheduled for 30 October 2029 in a single amount. Economically, it is to be made from the individual sale of the units: the sales proceeds are first used to service the bank financing, and the funds available thereafter serve to repay the bond capital.

UPDATE of 14.10.2026: How does a target-price contract shape construction costs for your investment?

The contract with the designated general contractor for the refurbishment and rooftop extension is in the final stages of negotiation. The contract is planned as a target-price agreement and is expected to be signed before the end of 2026.

A target-price agreement differs from a fixed-price contract. The parties agree a target cost for the works, and cost deviations are handled under rules agreed in advance between them. The aim is greater cost transparency and planning certainty.

In real estate projects, construction costs are typically the largest cost item. Any cost overrun would reduce the project's financial buffer and could affect the funds available for repaying the bond. The agreement therefore matters directly to your investment.

The investment round closes on 29 October 2026, before signing is expected. The outcome of the negotiations will therefore not be known when you decide to invest. We will explain the impact of the final terms once the agreement is signed.

Invesdor is a Eurocrowd platform member.

Ausgezeichnet als Top-Innovator 2021

Winner of the Golden Bull as the best
Crowdfunding platform 2023.

ECSP lizensiert

Invesdor is licensed under the
ECSP regulation of the EU.